CRITICAL PATH ACCELERATION AND SIMULATION IN AIRCRAFT TECHNOLOGY PLANNING

被引:2
作者
BATSON, RG
机构
关键词
D O I
10.1109/TEM.1987.6499014
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:244 / 251
页数:8
相关论文
共 16 条
[1]  
AMMONS JD, 1982, LGWP7292003 LOCKH GE
[2]  
BILDSON RA, 1962, OPERATIONS RES NOV
[3]  
CLAYTON ER, 1972, J SYST MANAG FEB
[4]  
JAMES AM, 1985, LOCKHEED HORIZONS
[5]  
KLINGEL AR, 1966, MANAG SCI, V13
[6]  
*LOCKH GEORG C, 1985, LG84ER0174 FIN REP
[7]  
*LOCKH GEORG C, 1981, LG81ETP527 REP
[8]   OPERATIONS PLANNING WITH VERT [J].
MOELLER, GL ;
DIGMAN, LA .
OPERATIONS RESEARCH, 1981, 29 (04) :676-697
[9]  
Phillips D. T., 1976, OPERATIONS RES PRINC
[10]   WHY PROJECTS ARE ALWAYS LATE - A RATIONALE BASED ON MANUAL SIMULATION OF A PERT-CPM NETWORK [J].
SCHONBERGER, RJ .
INTERFACES, 1981, 11 (05) :66-70