MODEL RELATING MEASUREMENT AND FORECAST ERRORS TO THE PROVISIONING OF DIRECT FINAL TRUNK GROUPS

被引:6
作者
FRANKS, RL [1 ]
HEFFES, H [1 ]
HOLTZMAN, JM [1 ]
HORING, S [1 ]
MESSERLI, FJ [1 ]
机构
[1] BELL TEL LABS INC, MATH ANAL & CONSULTING GRP, MURRAY HILL, NJ 07974 USA
来源
BELL SYSTEM TECHNICAL JOURNAL | 1979年 / 58卷 / 02期
关键词
D O I
10.1002/j.1538-7305.1979.tb02224.x
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper describes a mathematical model of the provisioning of direct final trunk groups with forecasting and measurement errors. This model can be used to study the effects of applying standard trunking formulas to possibly inaccurate load forecasts. An important consideration in the process is the degree to which the trunk forecast is actually followed. This so‐called provisioning policy is modeled parametrically to allow consideration of a range of strategies, from following the forecast precisely to complete reluctance to remove trunks when indicated by the trunk forecast. When load forecast errors are combined with a reluctance to remove trunks, there will be a net reserve capacity on the average, i.e., more trunks than would be needed if the loads were known exactly. Using the mathematical model, a set of curves known as Trunk Provisioning Operating Characteristics is calculated. These relate percentage of reserve capacity to service (as measured by the fraction of trunk groups with blocking exceeding 0.03). The accuracy of the estimate of the traffic load defines the curve on which one is constrained to operate. The degree of reluctance to remove trunks together with the traffic growth rate determines the operating point. Improved estimation accuracy corresponds to a more desirable operating characteristic. The accuracy of the forecast load estimate is influenced by many factors, such as data base errors (e.g., measuring the wrong quantity due to wiring or other problems), recording errors (e.g., key punch errors), and projection ratio errors. This type of modeling may be useful both in evaluating the potential effects of proposed improvements in measurement or forecasting accuracy, and in studying the effects of changes in provisioning policy. A discussion is given of trunk provisioning process issues based on the viewpoint presented in this paper. © 1979 The Bell System Technical Journal
引用
收藏
页码:351 / 377
页数:27
相关论文
共 9 条
[1]  
ARMSTRONG RJ, 1976, BELL LABORATORIE FEB, P39
[2]   COMBINATION OF FORECASTS [J].
BATES, JM ;
GRANGER, CWJ .
OPERATIONAL RESEARCH QUARTERLY, 1969, 20 (04) :451-&
[3]  
ELLDIN A, 1967, DIMENSIONING DYNAMIC, P315
[4]   TRAFFIC CAPACITY OF A PROBABILITY-ENGINEERED TRUNK GROUP [J].
HILL, DW ;
NEAL, SR .
BELL SYSTEM TECHNICAL JOURNAL, 1976, 55 (07) :831-842
[5]   NOVEL DENATURATION OF DNA [J].
JOHNSON, WC ;
GIROD, JC .
BIOCHIMICA ET BIOPHYSICA ACTA, 1974, 353 (02) :193-199
[6]  
MESSERLI EJ, 1977, OCT INT S MEAS TEL L
[7]  
OSHAUGHNESSY JJ, 1976, 8TH P INT TEL C MELB
[8]  
PARVIALA A, 1976, 8TH P INT TEL C MELB
[9]  
1977, ENGINEERING OPERATIO, pCH14