FORGING A PARTNERSHIP TO ACHIEVE COMPETITIVE ADVANTAGE - THE CIM CHALLENGE

被引:28
作者
DOLL, WJ [1 ]
VONDEREMBSE, MA [1 ]
机构
[1] UNIV TOLEDO,INFORMAT SYST & OPERAT MANAGEMENT,TOLEDO,OH 43606
关键词
D O I
10.2307/249364
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
引用
收藏
页码:205 / 220
页数:16
相关论文
共 64 条
[1]  
ABERNATHY WJ, 1981, HARVARD BUS REV, V59, P68
[2]   User Managers' Systems Needs [J].
Alloway, Robert M. ;
Quillard, Judith A. .
MIS QUARTERLY, 1983, 7 (02) :27-41
[3]  
BENJAMIN RI, 1984, SLOAN MANAGE REV, V25, P3
[4]  
BLACK JT, 1983, IND ENG, V15, P36
[5]  
BLUMENTHAL M, 1985, TECHNOLOGY REV, V88, P29
[6]   INFORMATION TECHNOLOGY AND PRODUCTIVITY - MYTHS AND REALITIES [J].
BODDY, D ;
BUCHANAN, DA .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1984, 12 (03) :233-240
[7]  
*BOOZ ALL HAM INC, 1982, NEW PROD MAN 1980S
[8]   PLANNING THE INTRODUCTION AND PREDICTING THE BENEFITS OF GROUP TECHNOLOGY [J].
BURBIDGE, JL ;
DALE, BG .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1984, 8 (1-2) :117-128
[9]  
CARTER CF, 1984, PRODUCTION ENG SEP, P84
[10]  
Chang T. C., 1985, INTRO AUTOMATED PROC