SCHEDULING ON A 2-MACHINE FLOWSHOP SUBJECT TO RANDOM BREAKDOWNS WITH A MAKESPAN OBJECTIVE FUNCTION

被引:37
作者
ALLAHVERDI, A [1 ]
MITTENTHAL, J [1 ]
机构
[1] RENSSELAER POLYTECH INST,DEPT DECIS SCI & ENGN SYST,TROY,NY 12180
关键词
STOCHASTIC SCHEDULING; FLOWSHOPS; RANDOM BREAKDOWNS; MAKESPAN;
D O I
10.1016/0377-2217(93)E0318-R
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Two-machine flowshop scheduling problems have been discussed in the literature extensively under the assumption that machines are continuously available. We address the problem of minimizing makespan in a two-machine flowshop when the machines are subject to random breakdowns. We first show that it is sufficient to consider the same sequence of the jobs on each machine. After providing an elimination criterion for minimizing makespan with probability 1, we show that under appropriate conditions Johnson's algorithm stochastically minimizes makespan.
引用
收藏
页码:376 / 387
页数:12
相关论文
共 22 条
[1]  
ALLAHVERDI A, 1994, NAV RES LOG, V41, P677, DOI 10.1002/1520-6750(199408)41:5<677::AID-NAV3220410509>3.0.CO
[2]  
2-7
[3]  
Baker K., 1974, INTRO SEQUENCING SCH
[4]  
BIRGE J, 1990, NAV RES LOG, V37, P661, DOI 10.1002/1520-6750(199010)37:5<661::AID-NAV3220370506>3.0.CO
[5]  
2-3
[6]  
CHU CB, 1992, NAV RES LOG, V39, P265, DOI 10.1002/1520-6750(199203)39:2<265::AID-NAV3220390209>3.0.CO
[7]  
2-L
[8]  
DANIELS RL, 1990, NAV RES LOG, V37, P981, DOI 10.1002/1520-6750(199012)37:6<981::AID-NAV3220370617>3.0.CO
[9]  
2-H
[10]  
DUNNINGHAM AA, 1973, NAV RES LOG, V20, P69