A DECOMPOSITION APPROACH TO MULTI-PROJECT SCHEDULING

被引:48
作者
DECKRO, RF
WINKOFSKY, EP
HEBERT, JE
GAGNON, R
机构
[1] MEAD CO,ZELLERBACH,MIAMISBURG,OH 45342
[2] UNIV AKRON,COLL BUSINESS ADM,AKRON,OH 44325
[3] WAKE FOREST UNIV,BABCOCK GRAD SCH MANAGEMENT,WINSTON SALEM,NC 27109
关键词
PROJECT MANAGEMENT; SCHEDULING; INTEGER PROGRAMMING; HEURISTICS;
D O I
10.1016/0377-2217(91)90150-T
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper develops the use of a decomposition algorithm in solving a resource limited, multi-project scheduling problem. The decomposition approach offers two distinct advantages over a direct optimization approach: (1) the ability to realistically solve large problems, and (2) the option of using the decomposition approach as a heuristic. This approach provides a performance measure on all feasible solutions, allowing the user to decide if further calculation expense is warranted in view of the absolute potential gain in the incumbent solution value.
引用
收藏
页码:110 / 118
页数:9
相关论文
共 14 条
[1]  
[Anonymous], MODEL BUILDING MATH
[2]   THE SCHEDULE-SEQUENCING PROBLEM [J].
BOWMAN, EH .
OPERATIONS RESEARCH, 1959, 7 (05) :621-624
[3]  
Cohen C., 1978, MULTIPURPOSE OPTIMIZ
[4]  
Conway R, 1967, THEORY SCHEDULING
[5]  
FENDLEY LG, 1968, J IND ENGINEERING, V19, P505
[6]  
GEOFFRION AM, 1968, RAND RM5627PR MEM
[7]  
IGNIZIO JP, 1980, J OPER RES SOC, V31, P217
[8]  
Karp R. M., 1975, Networks, V5, P45
[9]  
KURTLUS IS, 1985, MANAGE SCI, V28, P161
[10]   JOB-SHOP SCHEDULING BY IMPLICIT ENUMERATION [J].
LAGEWEG, BJ ;
LENSTRA, JK ;
RINNOOYKAN, AHG .
MANAGEMENT SCIENCE, 1977, 24 (04) :441-450