Development requirements for an advanced gas turbine system

被引:23
作者
Bannister, RL
Cheruvu, NS
Little, DA
McQuiggan, G
机构
[1] Westinghouse Electric Corporation, Orlando, FL
来源
JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME | 1995年 / 117卷 / 04期
关键词
D O I
10.1115/1.2815458
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
In cooperation with U.S. Department of Energy's Morgantown Energy Technology Center, a Westinghouse-led team is working on the second part of an 8-year, Advanced Turbine Systems Program to develop the technology required to provide a significant increase in natural gas-fired combined cycle power generation plant efficiency. This paper reports on the Westinghouse program to develop an innovative natural gas-fired advanced turbine cycle, which, in combination with increased firing temperature, use of advanced materials, increased component efficiencies, and reduced cooling air usage, has the potential of achieving a lower heating value plant efficiency in excess of 60 percent.
引用
收藏
页码:724 / 733
页数:10
相关论文
共 7 条
[1]  
ARSENER LV, 1990, TEPLOENERGETIKA, V37, P19
[2]  
BANNISTER RL, 1993, OCT P INT EN C EN 93
[3]  
CRISALL AJ, 1993, ASME93GT231 PAP
[4]  
LITTLE DA, 1993, ASME COGEN TURBO POW, VB, P271
[5]  
Newby R. A., 1993, Modern Power Systems, V13
[6]  
STEPHENS JO, 1990, 19TH P TURB S, P31
[7]  
WEBB HA, 1993, ASME93GT356 PAP