A RULES-BASED SCHEDULING SYSTEM FOR FLOW TYPE ASSEMBLY

被引:2
作者
COPAS, C
BROWNE, J
机构
[1] Computer Integrated Manufacturing Research Unit, University College, Galway
关键词
D O I
10.1080/00207549008942768
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The scheduling system described in this paper is to be used for the short-term planning and control of assembly systems at the production activity control (PAC) level. PAC operates as close to real-time as possible, and therefore the scheduling system has to be capable of analysing the manufacturing system and generating a schedule in a short time frame. Because of this time constraint, traditional scheduling techniques such as branch and bound, dynamic programming, etc., are inappropriate The approach taken in this scheduling system is to combine heuristic rules with newly developed artificial intelligence (AI) techniques while incorporating insights into scheduling gained from a study of the just-in-time, optimized production technology and manufacturing resource planning (MRP II) approaches to production management. The resulting scheduling system is presented, and its implementation on a MicroVAX workstation using data from an electronics assembly facility is described. © 1990 Taylor & Francis Group, LLC.
引用
收藏
页码:981 / 1005
页数:25
相关论文
共 20 条
[1]  
Acock M., Zemel R., DISPATCHER: A1 software for automated material handling systems, Ultratech-Al in Manufacturing Conference, (1986)
[2]  
Blackstone J.H., Phillips D.X., Hogg C.L., A state of the art survey of dispatching rules for manufacturing job shop operations, International Journal of Production Research, 20, pp. 27-45, (1982)
[3]  
Bourne D.A., Fox M., Autonomous manufacturing: Automating the job shop, IEEE Computer, pp. 76-86, (1984)
[4]  
Brooks G.H., White C.R., An algorithm for finding optimal or near optimal solutions to the production scheduling problem, Journal of Industrial Engineering, 16, pp. 34-40, (1965)
[5]  
Browne J., Production activity control-a key aspect of production control, International Journal of Production Research, 26, 3, pp. 415-427, (1988)
[6]  
Browne J., Harhen J., Shivnan J., Production Management Systems, (1988)
[7]  
Chang F.-C., A Knowledge-Based Real Time Decision System for Job Shop Scheduling at the Shop Floor Level, (1985)
[8]  
Conway R.W., Maxwell W.L., Network dispatching by shortest operation discipline, Operational Research, 10, (1962)
[9]  
Goldratt E., Cox J., The Goal, (1986)
[10]  
Goodwin J.A., Weeks J.K., Evaluating scheduling policies in a multilevel assembly system, International Journal of Production Research, 24, pp. 247-257, (1986)