OPTIMAL SCHEDULED-MAINTENANCE POLICY BASED ON MULTIPLE-CRITERIA DECISION-MAKING

被引:10
作者
HWANG, CL [1 ]
TILLMAN, FA [1 ]
WEI, WK [1 ]
LIE, CH [1 ]
机构
[1] SEOUL NATL UNIV, DEPT IND ENGN, SEOUL, SOUTH KOREA
关键词
Multiple-criteria decision-making; Replacement policy;
D O I
10.1109/TR.1979.5220654
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Usually, more than one independent (conflicting) criterion is important in determining the replacement age of a critical item for a maintained system. In this study, mathematical models have been developed for three such criteria: 1) minimum replacement cost-rate, 2) maximum availability, and 3) lower-bound on mission reliability. The solutions are obtained using four methods for multiple criteria decision making: 1) strictest-selection, 2) lexicographic, 3) Waltz lexicographic, and 4) sequential multiple-objective problem-solving technique (SEMOPS). Using an aircraft engine as an example, the optimal replacement age has been found by the four different methods. The results and the implications of the methods are discussed. Copyright © 1979 by the Institute of Electrical and Electronics Engineers, Inc.
引用
收藏
页码:394 / 399
页数:6
相关论文
共 6 条
[1]  
BELL CF, 1966, 1966 P ANN S REL SAN
[2]  
Hwang C, 1979, MULTIPLE OBJECTIVE D, DOI [10.1007/978-3-642-45511-7_3, DOI 10.1007/978-3-642-45511-7_3]
[3]   MAINTENANCE POLICY OF AIRCRAFT ACCORDING TO MULTIPLE CRITERIA [J].
LADANY, SP ;
AHARONI, M .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1975, 6 (11) :1093-1101
[4]   INTERACTIVE MULTIOBJECTIVE PROGRAMMING IN WATER-RESOURCES - CASE STUDY [J].
MONARCHI, DE ;
KISIEL, CC ;
DUCKSTEIN, L .
WATER RESOURCES RESEARCH, 1973, 9 (04) :837-850
[5]   MULTIOBJECTIVE OPTIMIZATION BY THE SURROGATE WORTH TRADE-OFF METHOD [J].
SAKAWA, M .
IEEE TRANSACTIONS ON RELIABILITY, 1978, 27 (05) :311-314