APPLICATION OF DYNAMIC-PROGRAMMING TO OPTIMIZE TOOL REPLACEMENT SCHEDULES FOR MULTI-TOOL OPERATIONS INVOLVING DISTRIBUTED TOOL LIVES

被引:1
作者
BAO, H
机构
来源
JOURNAL OF MECHANICAL DESIGN-TRANSACTIONS OF THE ASME | 1980年 / 102卷 / 03期
关键词
D O I
10.1115/1.3254767
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
引用
收藏
页码:446 / 451
页数:6
相关论文
共 26 条
[1]  
Armarego E.J.A., 1969, MACHINING METALS, P437, DOI 10.1016/0043-1648(69)90131-8
[2]  
BATRA JL, 1972, N049 PURD LAB APPL I
[3]  
BEDINI R, 1971, 3RD INT SEM OPT MAN
[4]  
Bellman R. E., 1962, APPL DYNAMIC PROGRAM
[5]  
BHATTACHARYYA A, 1970, T ASME, V92, P711
[6]  
BREWER RC, 1966, ANN CIRP, V14, P11
[7]  
BREWER RC, 1963, ENG DIG, V24, P133
[8]  
Cook N, 1966, MANUFACTURING ANAL
[9]   OPTIMIZATION OF CONSTRAINED MACHINING ECONOMICS PROBLEM BY GEOMETRIC PROGRAMMING [J].
ERMER, DS .
JOURNAL OF ENGINEERING FOR INDUSTRY, 1971, 93 (04) :1067-&
[10]  
ERMER DS, 1974, 2ND N AM MET WORK RE, P436