COMPLEXITY RESULTS FOR SCHEDULING CHAINS ON A SINGLE-MACHINE

被引:44
作者
LENSTRA, JK [1 ]
RINNOOYKAN, AHG [1 ]
机构
[1] ERASMUS UNIV,ROTTERDAM,NETHERLANDS
关键词
D O I
10.1016/0377-2217(80)90111-3
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:270 / 275
页数:6
相关论文
共 18 条
[1]  
Bricker P., 1977, ANN DISCRETE MATH, V1, P343, DOI [DOI 10.1016/S0167-5060(08)70743-X, 10.1016/S0167-5060(08)70743-X]
[2]  
COFFMAN EG, 1972, ACTA INFORM, V1, P200, DOI DOI 10.1007/BF00288685
[3]  
Conway R, 1967, THEORY SCHEDULING
[4]  
Garey M.R., 1979, COMPUTERS INTRACTABI
[5]   SCHEDULING TASKS WITH NONUNIFORM DEADLINES ON 2 PROCESSORS [J].
GAREY, MR ;
JOHNSON, DS .
JOURNAL OF THE ACM, 1976, 23 (03) :461-467
[6]   STRONG NP-COMPLETENESS RESULTS - MOTIVATION, EXAMPLES, AND IMPLICATIONS [J].
GAREY, MR ;
JOHNSON, DS .
JOURNAL OF THE ACM, 1978, 25 (03) :499-508
[7]  
GAREY MR, 1975, COMMUNICATION
[8]  
Graham R. L., 1979, Discrete Optimisation, P287
[9]  
Ibaraki T., 1976, Transactions of the Institute of Electronics and Communication Engineers of Japan, Section E (English), VE59, P1
[10]  
LAGEWEG BJ, 1976, COMMUNICATION