OPTIMAL TIME-VARYING PUMPING RATES FOR GROUNDWATER REMEDIATION - APPLICATION OF A CONSTRAINED OPTIMAL-CONTROL ALGORITHM

被引:87
作者
CHANG, LC [1 ]
SHOEMAKER, CA [1 ]
LIU, PLF [1 ]
机构
[1] CORNELL UNIV,SCH CIVIL & ENVIRONM ENGN,ITHACA,NY 14853
关键词
D O I
10.1029/92WR01685
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A numerically efficient procedure is presented for computing optimal time-varying pumping rates for remediation of contaminated groundwater described by two-dimensional numerical models. The management model combines a pollutant transport model with a constrained optimal control algorithm. The transport model simulates the unsteady fluid flow and transient contaminant dispersion-advection in a two-dimensional confined aquifer. A Galerkin's finite element method coupled with a fully implicit time difference scheme is applied to solve the groundwater flow and contaminant transport equations. The constrained optimal control algorithm employs a hyperbolic penalty function. Several sample problems covering 5-15 years of remediation are given to illustrate the capability of the management model to solve a groundwater quality control problem with time-varying pumping policy and water quality constraints. In our example, the optimal constant pumping rates are 75% more expensive than the optimal time-varying pumping rates, a result that supports the need to develop numerically efficient optimal control-finite element algorithms for groundwater remediation.
引用
收藏
页码:3157 / 3173
页数:17
相关论文
共 28 条
[1]   2-STAGE GROUNDWATER REMEDIATION DESIGN [J].
AHLFELD, D .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1990, 116 (04) :517-529
[2]   CONTAMINATED GROUNDWATER REMEDIATION DESIGN USING SIMULATION, OPTIMIZATION, AND SENSITIVITY THEORY .2. ANALYSIS OF A FIELD SITE [J].
AHLFELD, DP ;
MULVEY, JM ;
PINDER, GF .
WATER RESOURCES RESEARCH, 1988, 24 (03) :443-452
[3]   CONTAMINATED GROUNDWATER REMEDIATION DESIGN USING SIMULATION, OPTIMIZATION, AND SENSITIVITY THEORY .1. MODEL DEVELOPMENT [J].
AHLFELD, DP ;
MULVEY, JM ;
PINDER, GF ;
WOOD, EF .
WATER RESOURCES RESEARCH, 1988, 24 (03) :431-441
[4]  
AHLFELD DP, 1987, THESIS PRINCETON U P
[5]   OPTIMIZATION OF THE PUMPING SCHEDULE IN AQUIFER REMEDIATION UNDER UNCERTAINTY [J].
ANDRICEVIC, R ;
KITANIDIS, PK .
WATER RESOURCES RESEARCH, 1990, 26 (05) :875-885
[6]   HYDRAULIC-GRADIENT CONTROL FOR GROUNDWATER CONTAMINANT REMOVAL [J].
ATWOOD, DF ;
GORELICK, SM .
JOURNAL OF HYDROLOGY, 1985, 76 (1-2) :85-106
[7]   MASS-TRANSPORT IN FLOWING GROUNDWATER [J].
BREDEHOEFT, JD ;
PINDER, GF .
WATER RESOURCES RESEARCH, 1973, 9 (01) :194-210
[8]  
CHANG LC, 1990, THESIS CORNELL U ITH
[9]   DYNAMIC OPTIMAL-CONTROL FOR GROUNDWATER REMEDIATION WITH FLEXIBLE MANAGEMENT PERIODS [J].
CULVER, TB ;
SHOEMAKER, CA .
WATER RESOURCES RESEARCH, 1992, 28 (03) :629-641
[10]   AQUIFER RECLAMATION DESIGN - THE USE OF CONTAMINANT TRANSPORT SIMULATION COMBINED WITH NONLINEAR-PROGRAMMING [J].
GORELICK, SM ;
VOSS, CI ;
GILL, PE ;
MURRAY, W ;
SAUNDERS, MA ;
WRIGHT, MH .
WATER RESOURCES RESEARCH, 1984, 20 (04) :415-427