ADAPTIVE FORECASTING OF HOURLY MUNICIPAL WATER-CONSUMPTION

被引:21
作者
HOMWONGS, C
SASTRI, T
FOSTER, JW
机构
[1] Dept. of Industrial Engrg., Texas A and M Univ., College Station, TX
来源
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE | 1994年 / 120卷 / 06期
关键词
D O I
10.1061/(ASCE)0733-9496(1994)120:6(888)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
An adaptive smoothing-filtering approach for on-line forecasting of hourly municipal water use time series is presented. This method is suitable for forecasting an hourly water-consumption time series that is influenced by changing weather conditions and measurement outliers. The proposed seasonal time-series model and adaptive forecasting algorithm can capture both weekday and weekend cycles and produce very accurate forecasts from 1 h to 24 h ahead. The methodology is based on Winters' exponential smoothing, recursive least squares (RLS), and the Kalman filter. The Winters algorith is useful for recursive updating and extracting time-varying seasonal factors. The deseasonalized residuals are passed on to the RLS and the filter to correct model errors and to whiten the innovations. The on-line adaptive forecasting system also utilizes a data preprocessing procedure to handle measurement outliers, which are caused by data-recording errors and unmodeled disturbances. The validation tests conducted in the present study show that the forecasting system can maintain surprisingly small prediction errors, despite various unmodeled time-varying climatic variabilities.
引用
收藏
页码:888 / 905
页数:18
相关论文
共 16 条
[1]   SHORT-TERM LOAD DEMAND MODELING AND FORECASTING - A REVIEW [J].
ABUELMAGD, MA ;
SINHA, NK .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1982, 12 (03) :370-382
[2]  
Astrom K. J., 1990, COMPUTER CONTROLLED, V2nd
[3]  
Bowerman B. L., 1993, FORECASTING TIME SER
[4]  
Box G.E.P., 1976, TIME SERIES ANAL
[5]  
HIGGINS L, 1971, 8TH WORLD EN C
[6]   ALFA - AUTOMATED LOAD FORECASTING ASSISTANT [J].
JABBOUR, K ;
RIVEROS, JFV ;
LANDSBERGEN, D ;
MEYER, W .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (03) :908-914
[7]  
JAMIESON RA, 1993, J AM WATER WORKS ASS, V85, P48
[8]  
NEWTON JN, 1988, TIMESLAB TIME SERIES
[9]   METHODOLOGY FOR IMPROVING PUMP OPERATION EFFICIENCY [J].
ORMSBEE, LE ;
WALSKI, TM ;
CHASE, DV ;
SHARP, WW .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1989, 115 (02) :148-164
[10]  
PERRY FP, 1981, J HYDR DIV, V107, P1077