共 16 条
[1]
Bailakur A., Steudel H.J., Integration of job shop control systems: A state-of-the- art review, Journal of Manufacturing System, 3, 1, pp. 71-79, (1984)
[2]
Blackstone J.H., Phillips D.T., Hogg G.L., A state-of-the-art survey of dispatching rules for manufacturing job shop operations, International Journal of Production Research, 20, 1, pp. 27-45, (1982)
[3]
Carlier J., Simulation as a production planning tool for an FMS, Proceedings of the 2Nd International Conference on Simulation in Manufacturing, (1986)
[4]
Conway R.W., Priority dispatching and work-in-process inventory in a job shop, Journal of Industrial Engineering, 16, 2, pp. 123-130, (1965)
[5]
Conway R.W., Priority dispatching and job lateness in a job shop, Journal of Industrial Engineering, 16, 4, pp. 228-237, (1965)
[6]
Cook N., Computer managed parts manufacture, Scientific American, 223, 2, pp. 21-29, (1975)
[7]
Dar-El E.M., Wysk R.A., Job shop scheduling-A systematic approach, Journal of Manufacturing Systems, 1, 1, pp. 77-88, (1982)
[8]
Elmaraghy H.A., Simulation and graphical animation of advanced manufacturing systems, Journal of Manufacturing Systems, 1, 1, pp. 53-63, (1982)
[9]
Hershauer J.C., Ebert J., Search and simulation selection of a job-shop scheduling rule, Management Science, 21, 7, pp. 833-843, (1975)
[10]
McCartney J., Hinds B.K., Interactive scheduling procedures for flexible Manufacturing Systems, Proceedings of 22Nd International Machine Tool Design and Research Conference, pp. 47-54, (1981)