SCHEDULING JOBS SUBJECT TO NON-HOMOGENEOUS POISSON SHOCKS

被引:24
作者
PINEDO, ML
ROSS, SM
机构
[1] GEORGIA INST TECHNOL,ATLANTA,GA 30332
[2] UNIV CALIF BERKELEY,DEPT IND ENGN & OPERAT RES,BERKELEY,CA 94720
关键词
D O I
10.1287/mnsc.26.12.1250
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Consider n tasks which must be attempted in some order. To successfully complete any given task requires a random amount of time. However, suppose that there are external events, called shocks, which occur according to a nonhomogeneous Poisson process. If no shocks occur while a task is being performed, then that task is considered a success. If a shock does occur, then work on that task ends and work on the next one begins. The authors consider such problems as maximizing: (i) The expected number of successful tasks; (ii) The length of time until no tasks remain; (iii) The expected total reward earned; where a reward R//i is obtained upon successful completion of task i.
引用
收藏
页码:1250 / 1257
页数:8
相关论文
共 3 条