SINGLE-MACHINE SCHEDULING WITH CONTROLLABLE PROCESSING TIMES AND NUMBER OF JOBS TARDY

被引:61
作者
DANIELS, RL
SARIN, RK
机构
关键词
D O I
10.1287/opre.37.6.981
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:981 / 984
页数:4
相关论文
共 6 条
[1]  
DANIELS RL, 1986, THESIS U CALIFORNIA
[2]  
MOORE JM, 1968, MANAGE SCI, V15, P334
[3]   SCHEDULING WITH MULTIPLE PERFORMANCE-MEASURES - THE ONE-MACHINE CASE [J].
NELSON, RT ;
SARIN, RK ;
DANIELS, RL .
MANAGEMENT SCIENCE, 1986, 32 (04) :464-479
[4]   A BICRITERION APPROACH TO TIME COST TRADE-OFFS IN SEQUENCING [J].
VANWASSENHOVE, LN ;
BAKER, KR .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1982, 11 (01) :48-54
[6]   2 SINGLE-MACHINE SEQUENCING PROBLEMS INVOLVING CONTROLLABLE JOB PROCESSING TIMES [J].
VICKSON, RG .
AIIE TRANSACTIONS, 1980, 12 (03) :258-262