TRIANGULARITY OF THE BASIS IN LINEAR-PROGRAMS FOR MATERIAL REQUIREMENTS PLANNING

被引:1
作者
HO, JK
MCKENNEY, WA
机构
[1] Univ of Tennessee, United States
关键词
D O I
10.1016/0167-6377(88)90057-0
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Inventory Control
引用
收藏
页码:273 / 278
页数:6
相关论文
共 10 条
[1]   MATHEMATICAL-PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS - REVIEW, FORMULATION AND PROBLEM REDUCTION [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1983, 29 (10) :1126-1141
[2]   A PRIMAL SIMPLEX APPROACH TO PURE PROCESSING NETWORKS [J].
CHEN, CHJ ;
ENGQUIST, M .
MANAGEMENT SCIENCE, 1986, 32 (12) :1582-1598
[3]   DECOMPOSITION PRINCIPLE FOR LINEAR-PROGRAMS [J].
DANTZIG, GB ;
WOLFE, P .
OPERATIONS RESEARCH, 1960, 8 (01) :101-111
[4]   OPTIMAL SOLUTION OF A DYNAMIC LEONTIEF MODEL WITH SUBSTITUTION [J].
Dantzig, George B. .
ECONOMETRICA, 1955, 23 (03) :295-302
[5]  
HO JK, 1987, MATH PROGRAM STUD, V31, P119, DOI 10.1007/BFb0121182
[6]  
HO JK, 1987, AUG S PAR OPT MAD
[7]  
MCKENNEY WA, 1987, THESIS U TENNESSEE
[8]   OPTIMAL MULTILEVEL LOT SIZING FOR REQUIREMENTS PLANNING SYSTEMS [J].
STEINBERG, E ;
NAPIER, HA .
MANAGEMENT SCIENCE, 1980, 26 (12) :1258-1271
[9]  
VEINOTT AF, 1968, LINEAR ALGEBRA ITS A, V1, P181
[10]   NETWORK PROGRAMMING-MODELS FOR PRODUCTION SCHEDULING IN MULTI-STAGE, MULTI-ITEM CAPACITATED SYSTEMS [J].
ZAHORIK, A ;
THOMAS, LJ ;
TRIGEIRO, WW .
MANAGEMENT SCIENCE, 1984, 30 (03) :308-325