LOT SIZING TO REDUCE CAPACITY UTILIZATION IN A PRODUCTION PROCESS WITH DEFECTIVE ITEMS, PROCESS CORRECTIONS, AND REWORK

被引:81
作者
LEE, HL
机构
关键词
LOT SIZING; IMPERFECT YIELDS; PROCESS CONTROL; REWORK POLICY;
D O I
10.1287/mnsc.38.9.1314
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper deals with the lot sizing problem in which the key features of imperfections in a production process are explicitly modelled. These features include: process shifting to out-of-control states, detection of the out-of-control shifts, corrective actions following the detections, and the fixed setup and variable processing times of reworks. The problem is motivated by the wafer probe operation in semiconductor manufacturing. The key objective that drives the lot sizing decision is to reduce the total processing time on a critical resource. Such an objective is aimed at reducing the congestion level at this resource.
引用
收藏
页码:1314 / 1328
页数:15
相关论文
共 26 条
[1]  
AKELLA R, 1987, PART DISPATCH RANDOM
[2]   EMPIRICAL-EVALUATION OF A QUEUING NETWORK MODEL FOR SEMICONDUCTOR WAFER FABRICATION [J].
CHEN, H ;
HARRISON, JM ;
MANDELBAUM, A ;
VANACKERE, A ;
WEIN, LM .
OPERATIONS RESEARCH, 1988, 36 (02) :202-215
[4]  
EHRHARDT R, 1987, INT J PROD RES, V25, P1795
[5]   PERIODIC REVIEW PRODUCTION MODELS WITH VARIABLE YIELD AND UNCERTAIN DEMAND [J].
GERCHAK, Y ;
VICKSON, RG ;
PARLAR, M .
IIE TRANSACTIONS, 1988, 20 (02) :144-150
[6]  
HNATEK R, 1987, INTEGRATED CIRCUIT Q
[7]   A LOT SIZE MODEL WITH BACKLOGGING WHEN THE AMOUNT RECEIVED IS UNCERTAIN [J].
KALRO, AH ;
GOHIL, MM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (06) :775-786
[8]  
KARMAKAR U, 1986, PRODUCTION PLANNING
[9]   PRODUCTION CONTROL IN MULTISTAGE SYSTEMS WITH VARIABLE YIELD LOSSES [J].
LEE, HL ;
YANO, CA .
OPERATIONS RESEARCH, 1988, 36 (02) :269-279
[10]   SIMULTANEOUS DETERMINATION OF PRODUCTION CYCLE AND INSPECTION SCHEDULES IN A PRODUCTION SYSTEM [J].
LEE, HL ;
ROSENBLATT, MJ .
MANAGEMENT SCIENCE, 1987, 33 (09) :1125-1136