共 33 条
[1]
Bard J.F., Golany B., Determining the number of kanbans in a multiproduct multistage production system, International Journal of Production Research, 29, pp. 881-895, (1991)
[2]
Bitran G.R., Chang L., A mathematical programming approach to a deterministic Kanban system, Management Science, 33, pp. 427-441, (1987)
[3]
Browne J., Harhen J., Shivnan J., Production Management Systems: A CIM Perspective, (1988)
[4]
Buzacott J.A., Queueing models of kanban and MRP controlled production systems, Engineering Costs and Production Economics, 17, pp. 3-20, (1989)
[5]
Davis W.J., Stubitz S.J., Configuring a kanban system using a discrete optimization of multiple stochastic responses, International Journal of Production Research, 25, (1987)
[6]
Deleersnyder J.L., Hodgson T.J., Muller H., O'grady P.J., Kanban controlled pull systems: An analytic approach, Management Science, 35, pp. 1079-1091, (1989)
[7]
Finch B.J., Cox J.F., An examination of just-in-time management for the small manufacturer: With an illustration, International Journal of Production Research, 24, (1986)
[8]
Gravel M., Price W.L., Using the kanban in a job shop enviroment, International Journal of Production Research, 26, pp. 1105-1118, (1988)
[9]
Hall W.R., Driving the Productivity Machine: Production Planning and Control in Japan, (1981)
[10]
Huang P.Y., Rees L.P., Taylor B.W., A simulation analysis of the Japanese J1T techniques (With kanban) for multi-line, multi-stage production systems, Decision Sciences, 14, pp. 326-344, (1983)