MATHEMATICAL-PROGRAMMING FOR THE SCHEDULING PROBLEM WITH ALTERNATE PROCESS PLANS IN FMS

被引:18
作者
JIANG, JC
HSIAO, WC
机构
[1] Industrial Engineering Department Chung Yuan Christian University Chung-Li
关键词
0-1 INTEGER PROGRAMMING; ALTERNATE PROCESS PLANS; SCHEDULING; HEURISTIC; SIMULATION; ARTIFICIAL INTELLIGENCE;
D O I
10.1016/0360-8352(94)90226-7
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The purpose of this research is to consider the operational scheduling problem and the determination of production routing with alternate process plans simultaneously such that the advantages of routing flexibility are expected. The problem is formulated by using 0-1 integer programming regarding to the performance measure of either the minimum of the absolute deviation of meeting due date or the minimum of total completion time. The approach of mathematical programming generates the optimal schedule, rather than near optimal schedule or a better schedule, to meet the selected criterion. Two mathematical formulation models developed are presented and an example is shown in this paper referring to the either one of performance criteria.
引用
收藏
页码:15 / 18
页数:4
相关论文
共 12 条
[1]  
CHANG YL, 1985, ANN OPER RES, V3, P355
[2]   EFFECTS OF LOADING AND ROUTEING DECISIONS ON PERFORMANCE OF FLEXIBLE MANUFACTURING SYSTEMS [J].
CHEN, IJ ;
CHUNG, CH .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (11) :2209-2225
[3]   ROUTING FLEXIBILITY AND PRODUCTION SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM [J].
GHOSH, S ;
GAIMON, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 60 (03) :344-364
[4]   SCHEDULING APPROACHES FOR RANDOM JOB SHOP FLEXIBLE MANUFACTURING SYSTEMS [J].
HUTCHISON, J ;
LEONG, K ;
SNYDER, D ;
WARD, P .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (05) :1053-1067
[5]  
HUTCHISON J, 1991, OMEGA-INT J MANAGE S, V19, P520
[6]   THE INFLUENCE OF ALTERNATE PROCESS PLANNING IN JOB-SHOP SCHEDULING [J].
JIANG, JC ;
CHEN, MY .
COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 25 (1-4) :263-266
[7]   IS - AN INTELLIGENT SCHEDULER FOR BATCH MANUFACTURING SYSTEMS [J].
JIANG, JCK .
COMPUTERS & INDUSTRIAL ENGINEERING, 1991, 21 (1-4) :319-323
[8]   A COMPARISON OF DISPATCHING RULES FOR JOB SHOPS WITH MULTIPLE IDENTICAL JOBS AND ALTERNATIVE ROUTEINGS [J].
KIM, YD .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (05) :953-962
[9]   APPLICATION OF OPERATIONAL-RESEARCH MODELS AND TECHNIQUES IN FLEXIBLE MANUFACTURING SYSTEMS [J].
KUSIAK, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 24 (03) :336-345
[10]   LOADING A FLEXIBLE MANUFACTURING SYSTEM [J].
OGRADY, PJ ;
MENON, U .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1987, 25 (07) :1053-1068