DUE-DATE ASSIGNMENT TO MULTI-JOB CUSTOMER ORDERS

被引:13
作者
BAGCHI, U
JULIEN, FM
MAGAZINE, MJ
机构
[1] UNIV OTTAWA,OTTAWA,ON,CANADA
[2] UNIV WATERLOO,DEPT MANAGEMENT SCI,WATERLOO N2L 3G1,ON,CANADA
关键词
SCHEDULING; DUE-DATE ASSIGNMENT; ORDER SEQUENCING;
D O I
10.1287/mnsc.40.10.1389
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The paper addresses deterministic, nonpreemptive scheduling of jobs that are immediately available for processing on a single machine. The jobs-are partitioned into several multijob customer orders. The problem is to determine a due-date for each customer order and to schedule all the jobs such that a total penalty function is minimized. The total penalty function is the sum of penalties for job earliness, penalties for job tardiness, and penalties associated with the lead times of customer orders. The main result is that there is an optimal solution in which the jobs within each customer order are processed contiguously. This is an appealing feature in terms of implementation. Efficient algorithms are presented for solving special cases of this problem.
引用
收藏
页码:1389 / 1392
页数:4
相关论文
共 10 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[3]  
FEDERGRUEN A, 1993, NAV RES LOG, V40, P951, DOI 10.1002/1520-6750(199312)40:7<951::AID-NAV3220400707>3.0.CO
[4]  
2-1
[5]   ECONOMIC EVALUATION OF JOB SHOP DISPATCHING RULES [J].
JONES, CH .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (03) :293-307
[6]  
Julien F. M., 1990, Journal of Manufacturing and Operations Management, V3, P177
[7]   SCHEDULING WITH MONOTONOUS EARLINESS AND TARDINESS PENALTIES [J].
KAHLBACHER, HG .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 64 (02) :258-277
[8]   COMMON DUE DATE ASSIGNMENT TO MINIMIZE TOTAL PENALTY FOR THE ONE MACHINE SCHEDULING PROBLEM [J].
PANWALKAR, SS ;
SMITH, ML ;
SEIDMANN, A .
OPERATIONS RESEARCH, 1982, 30 (02) :391-399
[9]   OPTIMAL ASSIGNMENT OF DUE-DATES FOR A SINGLE PROCESSOR SCHEDULING PROBLEM [J].
SEIDMANN, A ;
PANWALKAR, SS ;
SMITH, ML .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1981, 19 (04) :393-399
[10]  
WEEKS JK, 1977, MANAGE SCI, V25, P872