FACTORS AFFECTING MASONRY-LABOR PRODUCTIVITY

被引:51
作者
SANDERS, SR
THOMAS, HR
机构
[1] Dept. of Civ. Engrg., 238 Harbert Engrg. Ctr., Auburn Univ., AL
[2] Dept. of Civ. Engrg. Pennsylvania Transp. Inst., Res. Building B, Pennsylvania State Univ., University Park, PA
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1991年 / 117卷 / 04期
关键词
D O I
10.1061/(ASCE)0733-9364(1991)117:4(626)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Past studies of masonry-labor Productivity fail to accurately identify the factors that most affect masonry productivity and to quantify the factors' effects. This paper describes a methodology to identify and quantify the project-related factors that significantly affect masonry productivity. Standardized data-collection techniques are used to collect and consolidate data from 11 central Pennsylvania masonry projects. Exploratory analyses are performed to determine which most affect productivity. The factors identified are the work type, building element, construction methods, design requirements, and weather. More detailed analyses indicate that: (1) Data from multiple projects can be consolidated to obtain statistically valid results; (2) repetitive designs can effect a 30% improvement in productivity; (3) designs that require extensive layout and cutting can negatively affect productivity by as much as 40%; and (4) the effects of weather on masonry productivity are not well understood and deserve additional research.
引用
收藏
页码:626 / 644
页数:19
相关论文
共 17 条
[1]  
Ahrens C.D., Meteorology Today, (1988)
[2]  
Dodge Construction Cost Information System, (1985)
[3]  
The Effect of Temperature on Productivity, (1974)
[4]  
Cirimm C.T., Wagner N.K., Weather effects on mason productivity, J. Constr. Div, 100, 3, pp. 319-335, (1974)
[5]  
Helander M., Human Factors/Ergonomics for Building and Construction, (1985)
[6]  
Hendrickson A.M., Martinelli D., Rehak D., Hierarchical rule-based activity duration estimation, J. Constr. Engrg. and Mgmt, 113, 2, pp. 288-302, (1987)
[7]  
Kilroy S., A Study of the Effects of Weather on Productivity in Masonry Construction Activities, (1989)
[8]  
Means Concrete and Masonry Cost Data, (1986)
[9]  
Means Construction Cost Data, (1986)
[10]  
Means Light Commercial Cost Data, (1989)