共 10 条
[1]
[Anonymous], TUNNEL TUNN
[2]
BURGESS H, 1980, J S AFR I MIN METALL, V89, pA84
[3]
DUBUGNON O, P INT C TUNNEL, V81
[4]
FARMER IW, 1979, 4TH P C INT SOC ROCK, V1, P371
[5]
JENNI JP, 1979, 4TH P INT C ISRM MON, V1, P267
[6]
A QUICK AND RELIABLE METHOD OF FORECASTING THE PERFORMANCE OF TUNNEL CUTTING MACHINES
[J].
ROCK MECHANICS,
1980, 12 (3-4)
:221-230
[7]
ROCK MACHINABILITY TESTING SYSTEM AND PREDICTION OF PRODUCTIVITY OF TUNNELLING MACHINES
[J].
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES,
1979, 16 (05)
:329-333
[8]
CONSISTENCY AND REPEATABILITY OF SCHMIDT HAMMER REBOUND DATA DURING FIELD TESTING
[J].
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES,
1980, 17 (03)
:167-171
[9]
TARKOY PJ, 1975, NSFRAT75030 NAT SCI
[10]
Wanner H, 1979, P 4 C INT SOC ROCK M, V1, P573