共 33 条
[1]
Bitran G.R., Chang L., A mathematical programming approach to a deterministic kanban system, Management Science, 33, pp. 427-441, (1987)
[2]
Brown K.A., Mitchell T.R., J ust-in-time versus batch manufacturing: The effects of perforrmance obstacles on direct labor, Proceedings of the National Decision Sciences Conference, pp. 1039-1042, (1989)
[3]
Changchit C., Kung H., Effect of learning in JIT production system: A simulation experiment on microcomputer, Computer & Industrial Engineering, 15, pp. 172-178, (1988)
[4]
Changchit C., Terrell M.P., Issues injust-in-time production system, International Industrial Engineering Conference Proceedings, pp. 360-364, (1988)
[5]
Crawford K.M., Blackstone J.H., Cox J.F., A study of JIT implementation and operating problems, International Journal of Production Research, 26, pp. 1561-1568, (1988)
[6]
Davis W.J., Stubitz S.J., Configuring a kanban system using a discrete optimization of multiple stochastic responses, International Journal of Production Research, 25, pp. 721-740, (1987)
[7]
Deleersnyder J.L., Hodgson T.J., Muller H., O'Gradv P.J., Kanban controlled pull systems: An analytic approach, Management Science, 35, pp. 1079-1091, (1989)
[8]
Ebrahimpour M., Fathi B.M., Dynamic simulation of a kanban production inventory system, International Journal Ofoperations and Production Management, 5, (1984)
[9]
Finch B.J., Cox J.F., An examination of just-in-time management for the small manufacturer: With an illustration, International Journal of Production Research, 24, pp. 329-342, (1986)
[10]
Gupta P.Y., Gupta C.M., A system dynamic model for multi-stage multi-line dualcard JIT-Kanban system, International Journal of Production Research, 27, pp. 309-352, (1989)