SCHEDULING OF REPETITIVE PROJECTS WITH COST OPTIMIZATION

被引:71
作者
MOSELHI, O
ELRAYES, K
机构
[1] Ctr. for Building Studies, Concordia Univ., Montreal H3G 1M8
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1993年 / 119卷 / 04期
关键词
D O I
10.1061/(ASCE)0733-9364(1993)119:4(681)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Existing dynamic programming formulations are capable of identifying, from a set of possible alternatives, the optimum crew size for each activity in a repetitive project. The optimization criterion of these formulations is, however, limited to the minimization of the overall duration of the project. While this may lead to the minimization of the indirect cost of the project, it does not guarantee its overall minimum cost. The objective of this paper is to present a model that incorporates cost as an important decision variable in the optimization process. The model utilizes dynamic programming and performs the solution in two stages: first a forward process to identify local minimum conditions, and then a backward process to ensure an overall minimum state. In the first stage, a process similar to that used in time-cost trade-off analysis is employed, and a simple scanning and selecting process is used in the second stage. An example project from the literature is analyzed in order to demonstrate the use of the model and its validity, and illustrate the significance of cost as a decision variable in the optimization process.
引用
收藏
页码:681 / 697
页数:17
相关论文
共 14 条
[1]  
Ahuja H.N., Project Management, (1984)
[2]  
Al Sarraj Z.M., Formal development of line-of-balance technique, J. Constr. Engrg. and Mgmt, 116, 4, pp. 689-704, (1990)
[3]  
Arditi D., Albulak M.Z., Comparison of network analysis with line of balance in a linear repetitive construction project, Proc. Sixth INTERNET Congress, 2, pp. 13-25, (1979)
[4]  
Arditi D., Albulak M.Z., Line-of-balance scheduling in pavement construction, J. Constr. Engrg. and Mgmt, 112, 3, pp. 411-424, (1986)
[5]  
Carr R.I., Meyer W.L., Planning construction of repetitive building units, J. Constr. Div, 100, 3, pp. 403-412, (1974)
[6]  
Chrzanowski E.N., Johnston D.W., Application of linear scheduling, J. Constr. Engrg. and Mgmt, 112, 4, pp. 476-491, (1986)
[7]  
Johnston D.W., Linear scheduling method for highway construction, J. Constr. Div, 107, 2, pp. 247-261, (1981)
[8]  
Lumsden P., The Line of Balance Method, (1968)
[9]  
Means Building Construction Cost Data, (1991)
[10]  
Programming House Building by Line of Balance, (1966)