A METER PLACEMENT METHOD FOR STATE ESTIMATION

被引:41
作者
BARAN, ME [1 ]
ZHU, JX [1 ]
ZHU, HB [1 ]
GARREN, KE [1 ]
机构
[1] CAROLINA POWER & LIGHT CO,SKAALE ENERGY CONTROL CTR,RALEIGH,NC 27607
关键词
METER PLACEMENT; POWER SYSTEM STATE ESTIMATION; BAD DATA DETECTION AND IDENTIFICATION; OBSERVABILITY ANALYSIS;
D O I
10.1109/59.466470
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper a new meter placement method is presented. The method is comprehensive in that all the important aspects of the problem - cost, accuracy, reliability, and bad data processing capability requirements - are incorporated into the method. The problem is solved in three stages. The objective in the first stage is to place a minimum set of measurements which satisfies the desired accuracy requirements. In the second stage, additional meters are placed to incorporate reliability requirements which are defined in term of loss of RTUs. In the third stage, additional meters are placed to improve the bad data processing ability of the state estimation in terms of detecting and identifying the bad data.
引用
收藏
页码:1704 / 1710
页数:7
相关论文
共 14 条
  • [1] AAM S, 1983, DESIGN MEASUREMENT S, V102, P3769
  • [2] ALATWAN AM, 1993, 11 POW SYST COMP C P, P713
  • [3] ARIATTI F, 1975, P PSCC CAMBRIDGE
  • [4] CLEMENTS KA, 1983, IEEE T POWER AP SYST, V102, P2012, DOI 10.1109/TPAS.1983.318187
  • [5] OBSERVABILITY METHODS AND OPTIMAL METER PLACEMENT
    CLEMENTS, KA
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1990, 12 (02) : 88 - 93
  • [6] EDELMANN H, 1978, P PSCC CAMBRIDGE
  • [7] HANDSCHIN E, 1976, 1975 P INT S COPOC 7, P104
  • [8] KOGLIN HJ, 1987, 9 POW SYST COMP C PS, P528
  • [9] KOGLIN HJ, 1975, P PSCC CAMBRIDGE
  • [10] KOREAS GN, 1993, JUL IEEE PES SUMM M