共 12 条
[1]
DETENTION POND SIZING FOR MULTIPLE RETURN PERIODS
[J].
JOURNAL OF HYDRAULIC ENGINEERING-ASCE,
1989, 115 (05)
:650-664
[2]
[Anonymous], 1960, P I CIVIL ENG, DOI DOI 10.1680/IICEP.1960.11649
[3]
OPTIMAL-DESIGN OF DETENTION AND DRAINAGE CHANNEL SYSTEMS
[J].
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE,
1985, 111 (01)
:99-112
[4]
Gray D M, 1961, J HYDRAUL DIV AM SOC, V87, P33, DOI DOI 10.1061/JYCEAJ.0000631
[5]
GRAPHIC ESTIMATION OF PEAK FLOW REDUCTION IN RESERVOIRS
[J].
JOURNAL OF HYDRAULIC ENGINEERING-ASCE,
1987, 113 (11)
:1441-1450
[6]
KESSLER A, 1983, THESIS TECHNION ISRA
[7]
Mays L.W., 1982, J WATER RESOUR PLANN, V108, P270, DOI [10.1061/JWRDDC.0000259, DOI 10.1061/JWRDDC.0000259]
[9]
DESIGN OF DUAL-PURPOSE DETENTION SYSTEMS USING DYNAMIC-PROGRAMMING
[J].
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE,
1987, 113 (04)
:471-484
[10]
SARGINSON E J, 1973, Journal of Hydrology (Amsterdam), V19, P351, DOI 10.1016/0022-1694(73)90107-8