STATUS OF THE HOLIFIELD HEAVY-ION RESEARCH FACILITY

被引:2
作者
MARTIN, JA
机构
[1] Oak Ridge National Laboratory, Oak Ridge, Tennessee
关键词
D O I
10.1109/TNS.1979.4330406
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The Holifield Heavy Ion Research Facility presently operates the Oak Ridge Isochronous Cyclotron (ORIC). This accelerator provides heavy ions up to argon with energies useful for nuclear physics. The Phase I expansion of this facility, now a year away from completion, includes a 25-MV vertical folded tandem accelerator, beam transport and injection systems to use the ORIC as an energy booster, and additional experiment areas for the beams directly from the tandem. The tandem-cyclotron combination will provide heavy ions with energies up to 25 MeV/A for A < 35 and above 6 MeV/A up to A = 160, with intensities ≥1011 particles/sec. Building construction for the project is essentially complete. The accelerator manufacturer, National Electrostatics Corporation, has completed installation and testing of the 10-m-diam by 30-m-high accelerator pressure vessel and has begun installation of the accelerator system. The column structure and injector have previously been assembled at the NEC plant and the digital control system operated without voltage on the column. It is expected that voltage tests will begin at Oak Ridge in January 1979 and beam tests in April. Completion of the project, including acceptance tests of the tandem and the beam injection system for ORIC, is presently scheduled for November 15, 1979. Construction of Phase II for the facility, which will include a much larger booster cyclotron and additional research areas, is expected to begin in 1982. Copyright © 1978 by The Institute of Electrical and Electronics Engineers, Inc.
引用
收藏
页码:1439 / 1444
页数:6
相关论文
共 9 条
[1]   PRELIMINARY EVALUATION OF A MODIFIED MUELLER-HORTIG GEOMETRY NEGATIVE-ION SOURCE USING A NEGATIVE-ION SOURCE TEST FACILITY [J].
ALTON, GD .
IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1976, 23 (02) :1113-1117
[2]  
ALTON GD, 1979, IEEE T NUCL SCI 2, V26
[3]   DESIGN CONSIDERATIONS FOR ORNL 25 MV TANDEM ACCELERATOR [J].
BAIR, JK ;
BIGGERSTAFF, JA ;
JONES, CM ;
LARSON, JD ;
MCCONNELL, JW ;
MILNER, WT ;
ZIEGLER, NF .
IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1975, NS22 (03) :1655-1658
[4]  
JONES CM, 1975, TM4942 OAK RIDG NAT
[5]   PHASE SPACE ACCEPTANCE AND EMITTANCE IN BEAM TRANSPORT WITH APPLICATION TO TANDEM ACCELERATORS [J].
LARSON, JD ;
JONES, CM .
NUCLEAR INSTRUMENTS & METHODS, 1977, 140 (03) :489-504
[6]  
Lord R. S., 1975, 7th International Conference on Cyclotrons and their Applications, P622
[7]   ENERGY BOOSTING OF A TANDEM BEAM WITH OAK-RIDGE ISOCHRONOUS CYCLOTRON [J].
LORD, RS ;
BALL, JB ;
HUDSON, ED ;
BECKERS, RM ;
FISCHER, KN ;
MCNEILLY, GS ;
RYLANDER, JD ;
MALLORY, ML ;
MARTIN, JA ;
MOSKO, SW .
IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1975, NS22 (03) :1679-1681
[8]   TRANSPORT OF DC AND BUNCHED BEAMS THROUGH A 25 MV FOLDED TANDEM ACCELERATOR [J].
MILNER, WT ;
ALTON, GD ;
HENSLEY, DC ;
JONES, CM ;
KING, RF ;
LARSON, JD ;
MOAK, CD ;
SAYER, RO .
IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1975, NS22 (03) :1697-1701
[9]  
MILNER WT, 1979, IEEE T NUCL SCI 2, V26