OPTIMAL PRODUCTION SEQUENCE FOR A PRODUCT WITH MATCHING COMPONENTS

被引:6
作者
SO, KC
SCOTT, CH
机构
[1] Univ of California, Irvine, CA
关键词
D O I
10.1287/opre.42.4.694
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In the manufacture of mechanical heart valves, very high precision manufacturing and quality control is an absolute necessity. Since a mechanical heart valve consists of a number of components, it is imperative that the components match precisely. Motivated by this need in heart valve manufacturing, we study a new production control model for a product comprised of matching components. The model is also applicable to other production systems for manufacturing high precision products requiring careful matching of components. For a two-component case, we prove that a ''greedy'' production sequencing rule is optimal. Based on this result, we then develop an effective greedy heuristic sequencing rule for more general cases. An extensive empirical study is used to evaluate the performance of this and one other heuristic rule.
引用
收藏
页码:694 / 708
页数:15
相关论文
共 10 条
[1]   ORDERING POLICIES IN AN ENVIRONMENT OF STOCHASTIC YIELDS AND SUBSTITUTABLE DEMANDS [J].
BITRAN, GR ;
DASU, S .
OPERATIONS RESEARCH, 1992, 40 (05) :999-1017
[2]   COPRODUCTION PROCESSES WITH RANDOM YIELDS IN THE SEMICONDUCTOR INDUSTRY [J].
BITRAN, GR ;
GILBERT, SM .
OPERATIONS RESEARCH, 1994, 42 (03) :476-491
[3]   DETERMINISTIC APPROXIMATIONS TO COPRODUCTION PROBLEMS WITH SERVICE CONSTRAINTS AND RANDOM YIELDS [J].
BITRAN, GR ;
LEONG, TY .
MANAGEMENT SCIENCE, 1992, 38 (05) :724-742
[4]   LOT-SIZING IN ASSEMBLY SYSTEMS WITH RANDOM COMPONENT YIELDS [J].
GERCHAK, Y ;
WANG, YZ ;
YANO, CA .
IIE TRANSACTIONS, 1994, 26 (02) :19-24
[5]   OPTIMAL MACHINE SETTINGS OF IMPERFECT COMPONENT PRODUCTION PROCESSES FOR ASSEMBLY OPERATIONS [J].
LEE, HL ;
HAUSMAN, WH ;
GUTIERREZ, GJ .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1990, 6 (06) :652-658
[6]  
MAZZOLA JB, 1987, NAV RES LOG, V34, P67, DOI 10.1002/1520-6750(198702)34:1<67::AID-NAV3220340107>3.0.CO
[7]  
2-R
[8]  
OU J, 1991, DYNAMIC SCHEDULING P
[9]  
Ross S. M., 1983, INTRO STOCHASTIC DYN
[10]  
YANO C, 1992, LOT SIZING RANDOM YI