REAL-TIME ECONOMIC-DISPATCH AND RESERVE ALLOCATION USING MERIT ORDER LOADING AND LINEAR-PROGRAMMING RULES

被引:31
作者
SHEBLE, GB
机构
关键词
D O I
10.1109/59.41692
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页码:1414 / 1420
页数:7
相关论文
共 7 条
[1]  
COOPER L, 1974, METHODS APPLICATIONS
[2]  
Luenberger D. G., 1973, INTRO LINEAR NONLINE
[3]  
SHEBLE G, 1985, THESIS STATE U
[4]  
Simmons D.M., 1975, NONLINEAR PROGRAMMIN
[5]   GENERATION DISPATCH WITH RESERVE MARGIN CONSTRAINTS USING LINEAR-PROGRAMMING [J].
WAIGHT, JG ;
BOSE, A ;
SHEBLE, GB .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1981, 100 (01) :252-258
[6]  
WAIGHT JG, 1981, IEEE T POWER APP MAY, P2226
[7]  
Wood AJ, 1984, POWER GENERATION OPE