共 31 条
[1]
Agin N., Optimum seeking with branch and bound, Mgmt. Sci, 4, 13, pp. 176-185, (1966)
[2]
Chang T.C., Network Resource Allocation Using an Expert System with Fuzzy Logic Reasoning, (1987)
[3]
Chang T.C., Crandall K.C., An algorithm for solving expected possibility and its application in construction resource allocation, Fuzzy Sets and Systems, (1990)
[4]
Chang T.C., Ibbs C.W., Priority ranking—A fuzzy expert system for priority decision making in building construction resource scheduling, Build. Envir, (1989)
[5]
Chang T.C., Ibbs C.W., Crandall K.C., A fuzzy logic system for expert systems, Artif. Intell. for Engrg. Design, Anal, and Manufacturing (AI EDAM), 2, 3, pp. 83-193, (1989)
[6]
Crandall K.C., Resource allocation with project manager control, Construction Research Applied to Practice, pp. 1-17, (1985)
[7]
Davis E.W., Project scheduling under resource constraints: Historical review and categorization of procedures, AIIE Trans, 5, 4, pp. 297-313, (1973)
[8]
Davis E.W., Networks: Resource allocation, J. Ind. Engrg, 6, 4, pp. 117-120, (1974)
[9]
Davis E.W., Project network summary measures and constrained resource scheduling, AIIE Trans, 7, 2, pp. 132-142, (1975)
[10]
Davis E.W., Heidom G.E., An algorithm for optimal project scheduling under multiple resource constraints, Mgmt. Sci, 17, 12, pp. 803-816, (1971)