TESTING FEASIBILITY IN A LOT SCHEDULING PROBLEM

被引:7
作者
ANDERSON, EJ
机构
关键词
ANALYSIS OF ALGORITHMS; COMPUTATIONAL COMPLEXITY; NP-HARDNESS OF A LOT SCHEDULING PROBLEM; PRODUCTION SCHEDULING; HEURISTIC; ECONOMIC LOT SCHEDULING PROBLEM;
D O I
10.1287/opre.38.6.1079
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider a version of the Economic Lot Scheduling Problem in which there are no costs specified. The usual form of this problem seeks a pattern of production that minimizes the sum of holding the setup costs. We investigate the problem of finding a feasible schedule which avoids a stockout given the initial stocks of the products being manufactured. It is shown that this problem is NP-hard, and an effective heuristic method for its solution is proposed. This heuristic method is compared with a more naive approach to the problem and some computational results are given.
引用
收藏
页码:1079 / 1088
页数:10
相关论文
共 18 条
[1]  
ARKIN E, 1988, 822 CORN U SCH OP RE
[2]  
BAKER KR, 1984, INTRO SEQUENCING SCH
[3]   THE ECONOMIC LOT-SCHEDULING PROBLEM - ACHIEVING FEASIBILITY USING TIME-VARYING LOT SIZES [J].
DOBSON, G .
OPERATIONS RESEARCH, 1987, 35 (05) :764-771
[4]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598
[5]  
GALLEGO G, 1988, 769 CORN U SCH OP RE
[6]  
GALLEGO G, 1988, 771 CORN U SCH OP RE
[7]  
Gallego G, 1988, 770 CORN U SCH OP RE
[8]  
Garey M. R., 1979, COMPUTERS INTRACTIBI
[9]  
GASCON A, 1988, INFOR, V26, P115
[10]   DETERMINISTIC DEMAND MULTI-PRODUCT SINGLE-MACHINE LOT SCHEDULING PROBLEM [J].
GRAVES, SC .
MANAGEMENT SCIENCE, 1979, 25 (03) :276-280