INTEGER PROGRAMMING APPROACH TO THE PROBLEM OF OPTIMAL UNIT COMMITMENT WITH PROBABILISTIC RESERVE DETERMINATION

被引:227
作者
DILLON, TS [1 ]
EDWIN, KW [1 ]
KOCHS, HD [1 ]
TAUD, RJ [1 ]
机构
[1] RHEIN WESTFAL TH AACHEN,INST ELEKTR ANLAGEN & ENERGIEWIRTSCHAFT,D-5100 AACHEN,FED REP GER
来源
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS | 1978年 / 97卷 / 06期
关键词
D O I
10.1109/TPAS.1978.354719
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
A method for determining the unit commitment schedule for hydro-thermal systems using extensions and modifications of the Branch and Bound method for Integer Programming has been developed. Significant features of the method include its computational practicability for realistic systems and proper representation of reserves associated with different risk levels. Contracts relating to power interchange have also been adequately modelled for such an approach. Copyright © 1979 by The Institute of Electrical and Electronics Engineers, Inc.
引用
收藏
页码:2154 / 2166
页数:13
相关论文
共 39 条
  • [1] ANSTINE LT, 1964, IEEE T POWER APP SYS, V83, P316
  • [2] OPTIMAL THERMAL GENERATING UNIT COMMITMENT
    AYOUB, AK
    PATTON, AD
    [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1971, PA90 (04): : 1752 - &
  • [3] BALDWIN CJ, 1959, AIEE T 3, V78, P1272, DOI DOI 10.1109/AIEEPAS.1959.4500539
  • [4] Billinton R, 1970, POWER SYSTEM RELIABI
  • [5] CARPENTIER JL, 1973, TC8EB PICA PAP
  • [6] DILLON TS, 1972, 4TH PSCC
  • [7] DILLON TS, 1977, SEP IFAC S CONTR MAN
  • [8] DILLON TS, 1976, JUN IFAC S LARG SCAL
  • [9] OPTIMAL FORMULATION AND SOLUTION OF SHORT-RANGE OPERATING PROBLEMS FOR A POWER-SYSTEM WITH FLOW CONSTRAINTS
    DODU, JC
    POUGET, J
    MERLIN, A
    MARTIN, P
    [J]. PROCEEDINGS OF THE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS, 1972, 60 (01): : 54 - &
  • [10] DOPAZO JF, 1974, WIN IEEE PES M NEW Y, P162