ON AN AUTOMATED 2-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER

被引:47
作者
KISE, H [1 ]
机构
[1] KYOTO INST TECHNOL,DEPT MECH & SYST ENGN,SAKYOU KU,KYOTO 606,JAPAN
关键词
D O I
10.15807/jorsj.34.354
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
A new flowshop scheduling problem related to automated manufacturing systems such as FMS's and FMC's is discussed. The problem is shown to be an extension of the two-machine flowship problem addressed by Johnson (or a special case of the three machine flowshop problem), and to be NP-hard. Some solvable cases are discussed.
引用
收藏
页码:354 / 361
页数:8
相关论文
共 11 条
[1]  
ARTHANARI TS, 1971, NAV RES LOG, V15, P135
[2]   SPECIAL CASE OF 3XN FLOW SHOP PROBLEM [J].
BURNS, F ;
ROOKER, J .
NAVAL RESEARCH LOGISTICS, 1975, 22 (04) :811-817
[3]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[4]  
GAREY MR, 1979, COMPUTERS INTRATRACT
[5]  
Graham R. L., 1979, Discrete Optimisation, P287
[6]  
JAIKUMAR R, 1986, HARVARD BUSINESS NOV
[7]  
Johnson SM, 1954, NAVAL RES LOGIST, V1, P61, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110]
[8]  
KISE H, 1991, T IIE, V23, P10
[9]   FLOWSHOP SCHEDULING WITH LIMITED TEMPORARY-STORAGE [J].
PAPADIMITRIOU, CH ;
KANELLAKIS, PC .
JOURNAL OF THE ACM, 1980, 27 (03) :533-549
[10]   MATHEMATICAL ASPECTS OF 3XN JOB-SHOP SEQUENCING PROBLEM [J].
SZWARC, W .
NAVAL RESEARCH LOGISTICS, 1974, 21 (01) :145-153