共 28 条
[1]
Bahi H.C., Ritzman L.P., Gupta J., Determining lot sizes and resource requirements: A review, Operations Research, 35, 3, pp. 329-345, (1987)
[2]
Benton W.C., Srivastava R., Product structure complexity and multilevel lot sizing using alternative costing policies, Decision Sciences, 16, 4, pp. 357-369, (1985)
[3]
Biggs J.R., Heuristic lot-sizing and sequencing rules in a multistage production inventory system, Decision Sciences, 10, pp. 96-115, (1979)
[4]
Biggs J.R., Goodman S.H., Hardy S.T., Lot sizing rules in a hierarchical multistage inventory system, Production Anti Inventory Management Journal, 18, 1, pp. 104-116, (1977)
[5]
Blackburn J.D., Kropp D.H., Million R.A., A comparison of strategies todampen nervousness in MRP systems, Management Science, 32, 4, pp. 413-429, (1986)
[6]
Blackburn J.D., Millen R.A., Improved heuristics for multi-stage requirements planning systems, Management Science, 28, 1, pp. 44-56, (1982)
[7]
Blackburn J.D., Millen R.A., The impact of a rolling schedule in a multi-level MRP system, Journal of Operations Management, 2, 2, pp. 125-135, (1982)
[8]
Box G.E., Hunter W.G., Hunter J.S., Statistics for Experimenters, (1978)
[9]
Chalmet L.G., Di-Bodt M., Wassenhove L.V., The effect of engineering changes and demand uncertainly on MRP lot sizing
[10]
a case study, International Journal of Production Research, 23, 2, pp. 233-251, (1985)