UNDERSTANDING AUTOMATIC-GENERATION CONTROL

被引:418
作者
JALEELI, N
EWART, DN
VANSLYCK, LS
FINK, LH
HOFFMANN, AG
MILLER, JM
GLAVITSCH, H
CONCORDIA, C
SCHULTE, RP
TAYLOR, CW
KEYHANI, A
BHATTI, TS
KOTHARI, DP
SATISH, J
NANDA, J
KOTHARI, ML
HARI, L
BHISE, GG
PONDER, JZ
CUCCHI, GA
ENNS, MK
THOMPSON, HH
机构
[1] POWER TECHNOL INC,CONSULTING SERV,SCHENECTADY,NY 12301
[2] ECC INC,FAIRFAX,VA
[3] CAJUN ELECT POWER CORP,BATON ROUGE,LA
[4] SWISS FED INST TECHNOL,CH-8092 ZURICH,SWITZERLAND
[5] BONNEVILLE POWER ADM,PORTLAND,OR
[6] OHIO STATE UNIV,COLUMBUS,OH 43210
[7] INDIAN INST TECHNOL,DEPT ELECT ENGN,DELHI,INDIA
[8] PENN NEW JERSEY MARYLAND INTERCONNECT,NORRISTOWN,PA 19403
[9] ELECTROCON INT,ANN ARBOR,MI
[10] CHETTY MAMANDUR ENERGY SERV INC,PINE BLUFF,AR
关键词
AREA CONTROL ERROR; AUTOMATIC GENERATION CONTROL; ECONOMIC DISPATCH; FREQUENCY RESPONSE; GOVERNOR ACTION; INADVERTENT ENERGY; LOAD FREQUENCY CONTROL; POWER SYSTEM CONTROL; POWER SYSTEM OPERATION; SPEED DROOP;
D O I
10.1109/59.207324
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper describes what automatic generation control (AGC) might be expected to do, and what may not be possible or expedient for it to do. The purposes and objectives of AGC are limited by physical elements involved in the process and, hence, the relevant characteristics of these elements are described. For reasons given in this paper, it is desired that AGC act slowly and deliberately over tens of seconds or a few minutes. From a perspective of utility operations, there is no particular economic or control purpose served by speeding up the AGC action. By this Task Force paper, the System Control Subcommittee is providing a resource to the power engineering community to help guide research into topics related to AGC.
引用
收藏
页码:1106 / 1122
页数:17
相关论文
共 31 条