共 11 条
[1]
WASH-1400, Reactor safety study: An assessment of accident risks in US commercial nuclear power plants, NUREG/CR-75/014, (1975)
[2]
Bush, Statistics of pressure vessel and piping failures, J. Pressure Vessel Technol. Trans. ASME, 110, pp. 225-233, (1988)
[3]
Harris, Dedhia, Eason, Patterson, Probability of failure in BWR reactor coolant piping, NUREG/CR-4792, 3, (1986)
[4]
Hazelton, Technical report on material selection and processing guidelines for BWR coolant pressure boundary piping, NUREG 0313, (1986)
[5]
Evaluation of Flaws in Austenitic Steel Piping, Journal of Pressure Vessel Technology, 108, pp. 352-366, (1986)
[6]
Nilsson, Brickstad, An estimation of the probability of failure for BWR-piping in Sweden, Trans. SMiRT 10, pp. 99-104, (1989)
[7]
Doctor, Bates, Heasler, Spanner, Nondestructive examination (NDE) reliability for inservice inspection of light water reactors, NUREG/CR-4469, 1-6, (1984)
[8]
Wheeler, Rankin, Spanner, Badalamente, Human factors study conducted in conjunction with a mini-round-robin assessment of ultrasonic technician performance, NUREG/CR-4600, (1986)
[9]
Taylor, Spanner, Heasler, Doctor, Deffebaugh, An evaluation of human reliability in ultrasonic in-service inspection for intergranular stress-corrosion cracks through round-robin testing, Materials Eval., 47, pp. 338-344, (1989)
[10]
Simonen, Woo, Analyses of the impact of inservice inspection using a piping reliability model, NUREG/CR-3869, (1984)