DUE DATE ASSIGNMENT FOR PRODUCTION SYSTEMS

被引:75
作者
SEIDMANN, A [1 ]
SMITH, ML [1 ]
机构
[1] TEXAS TECH UNIV,LUBBOCK,TX 79409
关键词
D O I
10.1287/mnsc.27.5.571
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:571 / 581
页数:11
相关论文
共 16 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]  
CONWAY RW, 1965, J IND ENGINEERING, V16, P228
[3]  
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
[4]  
ELMAGHRABY SE, 1968, J IND ENGINEERING, V19, P105
[5]  
Elvers D. A., 1973, PRODUCTION INVENTORY, V14, P63
[6]  
Feller W., 2008, INTRO PROBABILITY TH
[7]  
Gupta Jatinder N. D., 1971, AIIE T, V3, P199
[8]  
HEARD EL, 1970, THESIS INDIANA U
[9]   ECONOMIC EVALUATION OF JOB SHOP DISPATCHING RULES [J].
JONES, CH .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (03) :293-307
[10]  
REINITZ RC, 1963, IND SCHEDULING, pCH5