DEMAND DRIVEN DISPATCH - A METHOD FOR DYNAMIC AIRCRAFT CAPACITY ASSIGNMENT, MODELS AND ALGORITHMS

被引:87
作者
BERGE, ME
HOPPERSTAD, CA
机构
[1] Boeing Co, Seattle, WA
关键词
D O I
10.1287/opre.41.1.153
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A major problem for the airline industry is the assignment of airplane capacity to flight schedules to meet fluctuating market needs. Demand Driven Dispatch (D3) is an operating concept that addresses this problem. Utilizing a demand forecast which improves as flight departure approaches, aircraft are dynamically assigned to flights to better match the predicted final demands. The result, demonstrated in studies of actual airline systems, is an increase in passenger loads and revenues with simultaneously reduced costs for a net of 1-5% improvement in operating, profits. Concept implementation is simplified by the prevalence of yield management systems which provide the forecasting capability, and the emergence of airplane families which provide the necessary operational flexibility. Implementation also requires frequent solution of extremely large aircraft assignment problems. These problems, which can be formulated in terms of a multicommodity network flow, can be solved with heuristic algorithms shown to exhibit an accuracy and efficiency essential to successful concept implementation.
引用
收藏
页码:153 / 168
页数:16
相关论文
共 8 条
[1]   APPLYING INTEGER LINEAR-PROGRAMMING TO THE FLEET ASSIGNMENT PROBLEM [J].
ABARA, J .
INTERFACES, 1989, 19 (04) :20-28
[2]  
[Anonymous], 2012, DYNAMIC PROGRAMMING
[3]  
Bazarra M.S., 1990, LINEAR PROGRAMMING N
[4]   APPLICATION OF A PROBABILISTIC DECISION-MODEL TO AIRLINE SEAT INVENTORY CONTROL [J].
BELOBABA, PP .
OPERATIONS RESEARCH, 1989, 37 (02) :183-197
[5]  
Etschmaier M.M., 1984, AGIFORS, V24, P181
[6]   FLIGHT SCHEDULING AND MAINTENANCE BASE PLANNING [J].
FEO, TA ;
BARD, JF .
MANAGEMENT SCIENCE, 1989, 35 (12) :1415-1432
[7]  
GALLO G, 1986, MATH PROGRAM STUD, V26, P38, DOI 10.1007/BFb0121087
[8]  
PETERSON RM, 1986, PENULTIMATE HUB AIRP