共 9 条
[1]
BILLINTON R, 1971, WIN IEEE POW M
[2]
BILLINTON R, 1971, SEP EIC ANN GEN M QU
[3]
BILLINTON R, 71TP116PWR IEEE T PA
[4]
FREQUENCY AND DURATION METHODS FOR POWER SYSTEM RELIABILITY CALCULATION .4. MODELS FOR MULTIPLE BOILER-TURBINES AND FOR PARTIAL OUTAGE STATES
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1969, PA88 (08)
:1224-&
[5]
FREQUENCY AND DURATION METHODS FOR POWER SYSTEM RELIABILITY CALCULATIONS .3. GENERATION SYSTEM PLANNING
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1969, PA88 (08)
:1216-&
[6]
FREQUENCY AND DURATION METHODS FOR POWER SYSTEM RELIABILITY CALCULATIONS .I. GENERATION SYSTEM MODEL
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1968, PA87 (09)
:1787-&
[7]
FREQUENCY AND DURATION METHODS FOR POWER SYSTEM RELIABILITY CALCULATIONS .2. DEMAND MODEL AND CAPACITY RESERVE MODEL
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1969, PA88 (04)
:375-&
[8]
RINGLEE RJ, 70TP158PWR IEEE T PA
[9]
SINGH C, 1971, 7 PICA