共 13 条
- [4] Optimizing urban rail timetable under time-dependent demand and oversaturated conditions[J] . Huimin Niu,Xuesong Zhou.  Transportation Research Part C . 2013
- [5] Study on the Train Operation Optimization of Passenger Dedicated Lines Based on Satisfaction[J] . Zhipeng Huang,Huimin Niu,Wuhong Wang. <journal-title>Discrete Dynamics in Nature and Society . 2012
- [6] An elastic demand schedule-based multimodal assignment model for the simulation of high speed rail (HSR) systems[J] . Ennio Cascetta,Pierluigi Coppola.  EURO Journal on Transportation and Logistics . 2012 (1)
- [7] The First Optimized Railway Timetable in Practice [J]. TRANSPORTATION SCIENCE, 2008, 42 (04) : 420 - 435
- [8] Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds[J] . Xuesong Zhou,Ming Zhong.  Transportation Research Part B . 2006 (3)
- [9] Bicriteria train scheduling for high-speed passenger railroad planning applications[J] . Xuesong Zhou,Ming Zhong.  European Journal of Operational Research . 2004 (3)
- [10] A multiobjective model for passenger train services planning: application to Taiwan’s high-speed rail line[J] . Yu-Hern Chang,Chung-Hsing Yeh,Ching-Cheng Shen.  Transportation Research Part B . 2000 (2)