共 9 条
[5]
A modified shuffled frog-leaping optimization algorithm: applications to project management[J] . Emad Elbeltagi,Tarek Hegazy,Donald Grierson.Structure and Infrastructure Engineering . 2007 (1)
[6]
Shuffled frog-leaping algorithm: a memetic meta-heuristic for discrete optimization[J] . Muzaffar Eusuff,Kevin Lansey,Fayzul Pasha.Engineering Optimization . 2006 (2)
[7]
Pareto archived simulated annealing for job shop scheduling with multiple objectives[J] . R.K. Suresh,K.M. Mohanasundaram.The International Journal of Advanced Manufacturing Technology . 2006 (1)
[8]
Improved genetic algorithm for the job-shop scheduling problem
[J].
The International Journal of Advanced Manufacturing Technology,
2006, 27
:1021-1029