Numerical simulation of grooving method for floor heave control in soft rock roadway

被引:19
作者
Sun JinWang Lianguo School of Mechanics Civil Engineering China University of Mining TechnologyXuzhou China [221008 ]
机构
关键词
D O I
暂无
中图分类号
TD325.3 [];
学科分类号
0819 ;
摘要
<正>Grooving method can restrain the deformation and destruction of surrounding rock by transferring the maximum stress to deep rock,bringing about the effective control for floor heave in soft rock roadway. Based on this important effect,and to discuss the relationship between cutting parameters and pressurerelief effect,this paper carried out a numerical simulation of grooving along bottom slab and two sides of gateway with finite difference software FLAC2D.The results show that the control effect on floor heave in soft rock tunnel can be improved by selecting appropriate cutting parameters.Appropriately increasing the crevice depth in the middle of the floor can improve the stress state of bottom slab by stress transfer. So the floor heave can be more effectively controlled.To lengthen the crevice in the corners of roadway can simultaneously transfer the maximum stresses of bottom slab and two sides to deep rock,and promote the pressure-relief effect.Extending the crevice length and crevice width on both sides within a certain range can decrease the stress concentration in the corners of roadway,and reduce the deformation of two sides.The cutting position beneficial to restrain the floor heave is close to the bottom slab.
引用
收藏
页码:49 / 56
页数:8
相关论文
共 5 条
[1]  
Geotechnical assessment of the bearing capacity of coal mine floors[J] A. Afrouz;F. P. Hassani;M. J. Scoble International Journal of Mining and Geological Engineering 1988, 4
[2]  
Stability control of gate groups in deep wells[J] GUO Zhi-biao1;GUO Ping-ye1;HUANG Mao-hong2;LIU Yin-gen2 1School of Geotechnical Engineering;China University of Mining & Technology;Beijing 100083;China 2Xuzhou Mine Group Company;Xuzhou;Jiangsu 221167;China Mining Science and Technology 2009, 02
[3]  
Analytical model and application of stress distribution on mining coal floor[J] ZHU Shu-yun1; JIAN Zhen-quan1; HOU Hong-liang2; XIAO Wei-guo1; YAO Pu1 1School of Resources and Earth Science; China University of Mining & Technology; Xuzhou; Jiangsu 221008; China 2Department of Prevention and Treatment for Coal Mine Water; Zhengzhou Coal Group Ltd Co; Xinmi; Henan 452371; China Journal of China University of Mining & Technology 2008, 01
[4]   弱结构巷道围岩变形破坏与非均称控制机理 [J].
樊克恭 ;
蒋金泉 .
中国矿业大学学报, 2007, (01) :54-59
[5]  
Numerical Simulation of Coal Floor Fault Activation Influenced by Mining[J] WANG Lian-guo; MIAO Xie-xing School of Sciences; China University of Mining &Technology; Xuzhou; Jiangsu 221008; China Journal of China University of Mining & Technology(English Edition) 2006, 04