Efficient method for scheduling construction projects with resource constraints

被引:18
作者
Abeyasinghe, M.Chelaka L. [1 ]
Greenwood, David J. [1 ]
Johansen, D.Eric [1 ]
机构
[1] Department of the Built Environment, University of Northumbria at Newcastle, Ellison Building, Newcastle Upon Tyne, NE1 8ST, United Kingdom
关键词
D O I
10.1016/S0263-7863(00)00024-7
中图分类号
学科分类号
摘要
引用
收藏
相关论文
empty
未找到相关数据