共 20 条
[1]
An M., Baker C., Zeng J., A fuzzy-logic-based approach to qualitative risk modelling in the construction process, World J Eng, 2, 1, pp. 1-12, (2005)
[2]
Winch G.M., Managing construction projects: an information processing approach, (2002)
[3]
Saaty T.L., Multicriteria decision making: the analytic hierarchy process, (1990)
[4]
Kim S.B., Whang K.S., Forecasting the capabilities of Korean civil aircraft industry, Omega, 21, 1, pp. 91-98, (1993)
[5]
Cheng C.H., Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function, Euro J Oper Res, 96, pp. 343-350, (1996)
[6]
Badri M., Combining the AHP and GP for global facility location-allocation problem, Int J Product Econ, 62, 3, pp. 237-248, (1999)
[7]
Lee C.W., Kwak N.K., Information resource planning for a health-care system using an AHP-based goal programming method, J Oper Res Soc, 50, pp. 1191-1198, (1999)
[8]
Harbi K.M.A., Application of AHP in project management, Int J Project Manage, 19, 4, pp. 19-27, (2001)
[9]
Zhi H., Risk management for overseas construction, Int J Project Manage, 13, pp. 231-237, (1995)
[10]
Lyons T., Skitmore M., Project risk management in the Queensland engineering construction industry: a survey, Int J Project Manage, 22, pp. 51-61, (2004)