共 3 条
[2]
Linking the Estimate; the Schedule and the Cost Control through a Standardized WBS.[J].Biffi; Marie-Helene.AACE International Transactions.2008,
[3]
项目计划与控制.[M].卢向南主编;.机械工业出版社.2004,