共 4 条
- [2] Shou Qing Wang,Robert L. K. Tiong,S. K. Ting,D. Ashley.Evaluation and Management of Political Risks in China's BOT Projects[J].Journal of Construction Engineering and Management,2000
- [3] Sudong Ye,Robert L. K. Tiong.NPV-at-Risk Method in Infrastructure Project Investment Evaluation[J].Journal of Construction Engineering and Management,2000
- [4] Malik Ranasinghe.Private sector participation in infrastructure projects: a methodology to analyse viability of BOT[J].Construction Management and Economics,1999(5)