共 9 条
[1]
Heuristics for scheduling parameter sweep applications in grid environments. Casanova H,Legrand A,Zagorodnov D,et al. Proceedings of the 9th Heterogeneous Computing Workshop (HCW’2000) . 2000
[2]
A Deadline and budget constrained Cost-time optimization algorithmfor scheduling task farming applications on global grids. Buyya R,Murshed M,Abram son D. Proc.of the International Conference on Parallel and Distributed Processing Techniques and Applications(PDPTA) . 2002
[3]
Nimrod/G: An Architecture for a Resource Management and Scheduling System in a Global Computational Grid. Buyya R,Abramson D,Giddy J. Proceedings of the Fourth International Conference on High Performance computing in Asia-Pacific Region . 2000
[4]
Dynamic matching and scheduling of a class of independent tasks onto heterogeneous computing systems. Maheswaran M,Ali S,Siegel H J,et al. Proceedings of the 8th IEEE Heterogeneous Computing Workshop (HCWp99) . 1999
[5]
Security-Driven Heuristics and a Fast Genetic Algorithm for Trusted GridJob Scheduling. Shanshan Song,Yu-Ywong Kwok,Kai Hwang. Proceedings of the 18th International Parallel and Distributed Processing Symposium(IPDPS 05) . 2005
[6]
Segmented Min-Min: A Static Mapping Algorithm for Meta-tasks on Heterogeneous Computing Systems. Min-You Wu,Wei Shu,Hong Zhang. Proceedings of the 9th Heterogeneous Computing Workshop . 2000
[7]
Economic-Based Distributed Resource Management and Scheduling for Grid Computing. Buyya R. . 2002
[8]
A comparison of static QoS-based scheduling heuristics for a meta-task with multipleQoS dimensions in heterogeneous computing. Golconda K S,zgner F. Pro-ceedings of International Symposium on Parallel and Dis-tributed Processing . 2004
[9]
The Grid: Blueprint for a New Computing Infrastructure. Ian Foster,Carl Kesselman. . 1999