共 10 条
[5]
A model for prediction of time from corrosion initiation to corrosion cracking[J] . Tamer El Maaddawy,Khaled Soudki.Cement and Concrete Composites . 2006 (3)
[6]
Spatial time-dependent reliability analysis of corrosion damage and the timing of first repair for RC structures[J] . Mark G. Stewart,John A. Mullard.Engineering Structures . 2006 (7)
[10]
Probabilistic performance based durabilitydesign of concrete structures-statistical quantification ofthe variables in limit state functions .2 DuraCrete. The European union Brite Eu RamШ,Project BE 95-1347 . 1998