共 11 条
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
A genetic algorithm-based optimal resource-constrained scheduling simulation model.[J].Sou-Sen Leu;Tzung-Heng Hung.Construction Management and Economics.2002, 2
[9]
A note on similarity measures between vague sets and between elements.[J].Dug Hun Hong;Chul Kim.Information Sciences.1999, 1
[10]
Construction resource scheduling with genetic algorithms
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1996, 122 (02)
:125-132

