共 14 条
[1]
Machine scheduling in the presence of sequence-dependent setup times and a rate-modifying activity[J] Mehdi Iranpoor;S.M.T.Fatemi Ghomi;M. Zandieh International Journal of Production Research 2012,
[2]
Single machine scheduling with resource allocation and learning effect considering the rate-modifying activity[J] Zhanguo Zhu;Feng Chu;Linyan Sun;Ming Liu Applied Mathematical Modelling 2012,
[3]
Scheduling with job-dependent learning effects and multiple rate-modifying activities[J] Min Ji;T.C.E. Cheng Information Processing Letters 2010,
[4]
Single machine common flow allowance scheduling with a rate-modifying activity[J] Xiao-Yuan Wang;Ming-Zheng Wang Computers & Industrial Engineering 2010,
[5]
A note to due-window assignment and single machine scheduling with deteriorating jobs and a rate-modifying activity[J] Chuanli Zhao;Hengyong Tang Computers and Operations Research 2012,
[6]
A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration[J] Emmett J. Lodree;Christopher D. Geiger European Journal of Operational Research 2009,
[7]
A due-date assignment problem with learning effect and deteriorating jobs[J] Ji-Bo Wang;Qian Guo Applied Mathematical Modelling 2009,
[8]
Taxonomy for integrating scheduling theory and human factors: Review and research opportunities[J] Emmett J. Lodree;Christopher D. Geiger;Xiaochun Jiang International Journal of Industrial Ergonomics 2008,
[9]
A note: Common due date assignment for a single machine scheduling with the rate-modifying activity[J] Valery S. Gordon;Alexander A. Tarasevich Computers and Operations Research 2007,
[10]
Optimal due date assignment in multi-machine scheduling environments[J] Dvir Shabtay;George Steiner Journal of Scheduling 2008,

